ICDS-IV project (IDS assisted) : a handbook

By: Material type: TextTextLanguage: English Publication details: Central Project Management Unit, 2007.Description: 41 p. ; 23 cmSubject(s): DDC classification:
  • 23 658.404 CEN
Contents:
1. Foreword -- 2. introduction -- 3. The ICDS-IV project -- 4. Project components -- 5. Proposed results framework -- 6. Steps for preparation of state PIPs and district annual plans -- 7. State PIP.
Item type:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Shelving location Call number Status Date due Barcode Item holds
Reports Reports Gulbanoo Premji Library, Azim Premji University, Bengaluru Adarsh Sharma 3rd Floor 658.404 CEN (Browse shelf(Opens below)) Available G41487
Total holds: 0

1. Foreword --
2. introduction --
3. The ICDS-IV project --
4. Project components --
5. Proposed results framework --
6. Steps for preparation of state PIPs and district annual plans --
7. State PIP.

There are no comments on this title.

to post a comment.

Total Visits to Site (September 2024 onwards):best free website hit counter